This project involved design, procurement, shipping, installation, and commissioning of the entire tank farm project
Oil & Gas Tank Farm (Fuel Storage and Dispensing Facility)
ROHI executed a 1M litres Fuel Storage and Dispensing Facility in Tilenga Oilfield (Uganda) operated by Total Energies. This project involved design, procurement, shipping, installation, and commissioning of the entire tank farm project.
Details of Scope & objective
- Deliver full design, engineering, procurement, supply, installation, testing, commissioning and handover of a temporary fuel receiving, storage and dispensing facility.
- Facility capacity: above‑ground tanks totalling 1,000,000 litres; tanker receiving area; dispensing for large trucks and light vehicles.














Major deliverables / systems
- Tank farm and piping (double‑skin tanks, UL142 compliant), pump sets, receiving & dispensing metering, automatic tank gauging and fuel logging system.
- Storage tanks: fabricate above‑ground double‑skin diesel tanks (UL142 compliance), including saddles, lifting lugs and manholes.
- Tank supports & foundations hardware: base plates, tank saddles, lifting/holding down details and any base/load‑spreading plates.
- Piping & manifolds: shop‑fabricated fuel piping (receiving, suction, dispensing, emergency blind/iso connections), manifolds, nozzles, valves, non‑return and blind plates, pipe markers and associated underground pipework/spools.
- Pump skids / pump house equipment: fabricated pump mounts/skids, pump house steelwork and pump base plates.
- Metering & loading station hardware: fabricated loading valve station, flow meter housings, metering skids and connections.
- Access control / fuel management: system capable of 500 users + 500 RFID key tags for transaction logging.
- Power: supply continuous diesel generator, integrates generator with emergency shutoff to fuel system, and provides power demand estimates.
- Electrical, instrumentation and earthing/ lightning protection (earthing grid impedance ≤ 0.5 Ω).
- Civil works: tank bases, off‑loading slab, pump island, reinforced concrete paved receiving/dispensing area, bunds, spill containment anddrainage/interceptor (concept drawings.
- Site services: area lighting, emergency lighting, fire extinguishers at generator, and HSE/traffic signage.
Standards, Testing &Certification
- Design/installation to applicable codes: UL142, UL971, NFPA 30/30A, IEC, EN1998 (seismic) and project design basis.
- Storage tanks and metering to be independently certified; provide inspection & test plans (ITP), test records, calibration certificates and as‑built/redline drawings.
Operations & maintenance
- Supply equipment on purchase & install basis.
- Provide site service / maintenance & emergency repair agreement for minimum 4 years (extendable), including spare parts stock and annual calibration/certification of metering.
- Provide training for 4 Company personnel on operation, maintenance and data‑logging system; handover keys/passwords and 500 pre‑programmed key fobs.