East African Crude Oil Pipeline (EACOP) Construction
Rohi Investment Ltd is proud to be part of the East Africa Crude Oil Pipeline (EACOP), one of the region’s most important energy projects.
East African Crude Oil Pipeline (EACOP) Construction
The East African Crude Oil Pipeline (EACOP) is a 1,443-kmlong onshore crude‑oil export system carrying stabilized crude from Uganda to the marine storage & export terminal at Chongoleani, Tanga (Tanzania).
The purpose of the project is providing the pipeline transport, storage and export infrastructure needed to move heavy/waxy crude from upstream CPFs through the feeder/pipeline system to the coast, meeting safety, environmental and operational requirements.


Key Scope Elements
- ROW / ATWS staking and centre‑line marking
- Vegetation clearing: tree felling (stump removal, timber cut/evacuation) and bush clearing across full ROW
- Topsoil stripping, separation, protection and stockpiling (topsoil conservation)
- Erosion & sediment control and temporary protection (silt traps, geotextile, flumes/pipe crossings, diversion channels, shoring)
- Subgrade preparation: grading, leveling and compaction to produce a stable working surface for heavy plant
- Temporary access: build/maintain temporary access roads, passing lanes, traffic control and vehicle management
- Crossings and hydraulics: temporary/ permanent culverts, open‑cut road crossings and reinstatement, drainage channels and sumps
- Temporary works for water management (temporary access channels, diversion channels) and dewatering where required
- Service protection & verification: identify/mark/protect overhead lines and locate/mark underground utilities; special markers for service crossings
- Temporary site facilities and site security: site offices, portable toilets, welfare, security provision, IVMS on vehicles