ROHI Investments Projects

Crude Oil Pumping & Pressure reduction Station

This particular Pump Station is situated in Sembabule (Uganda) approximately 180kms from the capital Kampala

Crude Oil Pumping & Pressure reduction Station

The project sits within the East African Crude Oil Pipeline (EACOP) project — an onshore crude‑oil export system running from Uganda (Kabaale area) to the Marine Storage & Export Terminal (MST) at Chongoleani, Tanga, Tanzania.  This particular Pump Station is situated in Sembabule (Uganda) approximately 180kms from the capital Kampala.

The project work covers design/construction activities for Above‑Ground Installations (AGIs / Pumping & Pressure‑reduction Stations) and associated temporary facilities: civil works, foundations, structural steel, buildings, roads, underground networks (drainage, water, ducts), fences and site reinstatement.

AGIs include power generation, utilities, metering, pigging facilities, EITS (electrical/instrumentation/SCADA/telecom), operator buildings and associated midstream equipment.

Key Scope Elements

  • Civil & earthworks, foundations, bunds, sumps, drainage and erosion control.
  • Structural steel (piperacks, platforms, stairs, walkways), fabrication/erection.
  • Building and architectural works (offices, guardhouses, workshop/warehouse, sanitary facilities).
  • Roads, paved areas, parking, temporary/site access and reinstatement.
  • Underground networks: ducts, cable trenches, drainage, manholes, sumps and associated civil works.
  • H3SE, QA/QC, third‑party certification, training, national/local content and community engagement (ESIA/ESMP implementation).

Electrical / E&I / Instrumentation / SCADA

  • Equipment data sheets & certificates (transformers, switchgear, panels)
  • Cable certificates and insulation/continuity test records
  • Earthing/ground grid test report (overall impedance) and exothermic weld records
  • Lightning protection verification
  • Instrument calibration certificates and loop checks
  • FAT/SAT and integration test reports for control panels/SCADA

Power / Generators

  • Generator FAT and commissioning reports
  • Emissions/noise test records (limits & mitigation)
  • Battery & charger test/certificates
  • Electrical connections and emergency cut‑off verification

Lifting / Cranes / Rigging

  • Crane certification and periodic inspection records
  • Operator licences and training records
  • Lifting accessories certificates (slings, shackles) and test certificates
  • Engineering lift plans, JSA and lift witness records
  • Load test / statutory test certificates (where required)

Quality / Documentation

  • Project Quality Plan, approved ITPs and method statements
  • Material C.O.C. and supplier certificates (traceable)
  • Inspection & test records per ITP (signed)
  • Third‑party CA reports (AGI certification)
  • As‑built (redline) drawings, O&M manuals, spare parts lists
  • Calibration logs for test instruments

Civil / Concrete

  • Slump test records (per batch/pour)
  • Compression test reports (150 mm cubes: 7‑day & 28‑day)
  • Formwork/pre‑pour inspection signoffs
  • Compaction/density tests and proof‑roll records
  • Backfill material test reports (sieve/moisture)

Foundations / Structural

  • Reinforcement mill certificates & bar test reports
  • Welding WPS/PQR and welder qualification records (WQT)
  • NDT reports (RT/UT/MT) for welds
  • Structural steel mill certificates / material C.O.C.
  • Coating/galvanizing certificates and touch‑up records
  • Erection/grouting inspection checklists

Storage tanks / Fuel systems / Piping

  • Manufacturer data sheets and material mill certificates for tanks/pipes
  • Third‑party tank certification report (CA)
  • Welding WPS/PQR and welder qualifications for piping
  • NDT records for pressure/fuel piping welds
  • Hydrostatic/pressure test records (with witness)
  • Leak/tightness test records for lines, manholes, sumps
  • Meter FAT reports and calibration certificates (receiving & dispensing)
  • Automatic tank gauging / fuel logging FAT/SAT and calibration logs

Mechanical / Rotating equipment

  • Manufacturer FAT / performance test certificates for pumps
  • Alignment, balancing and vibration reports
  • Commissioning and run‑in reports

HSE / Environment / Security

  • H3SE Management Plan approvals and induction/training records
  • Emergency Response / MERP exercise reports
  • MSDS for hazardous materials and handling records
  • Waste disposal manifests and environmental monitoring logs
  • IVMS installation & driver training records
  • PSC compliance evidence (ISO18788 / VPSHR) if used
  •